You’re offline. This is a read only version of the page.
Skip to main content
MERS Customer Experience Portal
Toggle navigation
Home
Energy & Mining Website
Search the Register
Search the Register
Search Instruments
Search Tenements
Contact Us
Contact Us
Submit Support Ticket
Sign In
MERS
Mining Register
Search Instruments
Instrument Details
Your browser is not fully supported. For the best experience, please use the latest version of Chrome, Edge, Firefox, or Safari. You can still access the site, but some features might not function as expected.
X
X
Mining Register Search - Instrument Details
Explore Mining Register Instrument Details
Instrument Summary
Instrument Number
*
Sub-Category
Provision of Registration
Status Reason
Endorsed
Historical Type
Register
Mining Register
Mining Native Title Register
Offshore (SA)
Offshore (Cth)
Category
Legislative Reference
Tenements
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.
Dates
Start Date
*
Tenement Holder Consent Date
*
Expiry Date
*
Tenement Holder Submission Date
*
Ministerial, Director or Registrar Consent Date
*
Document Issued to Tenement Holder Date
*
Documents
Supporting Document
*
Summary Document
*
Supporting Document Confidential?
Summary Document Confidential
Notes
*
THIS DIRECTION RELATES TO: Mineral Lease 6137 and 6225 (Mineral Tenements). Property Description: land described in Certificate of Title Volume 5872 Folio 904 and Certificate of Title Volume 5885 Folio 73. REQUIREMENTS: 1. Murray Zircon is directed to: (a) Cease all planned disturbance on ML 6137 or ML 6225 other than carrying out the Directed Works "A" and "B". (b) Undertake a review of the rehabilitation liability estimate as a result of the exceedance of disturbance of land west of Jacka Road, and the exceedances of top soil and overburden disturbance (utilising the calculator available on the Department for Energy and Mining (DEM) website. (c) Provide the Department for Energy and Mining (DEM) with the revised rehabilitation liability estimate calculated in accordance with (b) above by 29 December 2023. (d) Develop a plan to demonstrate your return to compliance to the satisfaction of the Minister or his delegate, which should include a review of PEPR2022/167, and submit a Change in Operations application (refer to guidance material available on the DEM website), by 29 December 2023. (e) Undertake the rootzone soil removal and stockpiling in accordance with the action recommended in the report dated 13 November 2023 by Dr Chris McDonough (Insight Extension for Agriculture) (Directed Works "A"), to be completed as soon as possible, by 29 December 2023. (f) Engage (at Murray Zircon's expense) Dr Chris McDonough (or another independent expert approved by the Director of Minerals Regulation within the Department for Energy and Mining (DEM)) to: (i) monitor, at regular intervals, the undertaking of the Directed Works; and (ii) provide to Murray Zircon a report on the undertaking and outcome of the Directed Works. (g) Provide a copy of the independent expert's report prepared in accordance with (f)(ii) to DEM. (h) The Directed Works must only occur between 6am - 7pm on any day. (i) Engage (at Murray Zircon?s expense) Dr Chris McDonough (or another independent expert approved by the Director Minerals Regulation within DEM) to undertake an audit and provide a report to Murray Zircon of: (i) all stockpiles of topsoil and subsoil; and (ii) all bare and drifting soils across the Mineral Tenements, and, if the audit and report so recommends, ensure hydro mulching is applied as soon as possible, but in any event before 10 January 2024. (j) Provide a copy of independent expert's report prepared in accordance with (i) to DEM together with a written report of the action taken by Murray Zircon in response within seven calendar days of completion of the activities set out in (i). (k) Undertake the construction of tailings cell 6 wall (Directed Works "B"). These works include the rehandling of stockpiled and in situ ore only to facilitate the movement of the Mobile Mining Unit (MMU) and associated pipes and cabling within the pit. Once the MMU has been moved, construction of the cell 6 wall may occur using only stockpiled overburden (situated in the pit area or from current overburden stockpiles). No material may be stockpiled outside of the pit area. (l) Provide written notification and photographs to DEM once the Directed Works B set out in (k) are completed. (m) Ensure all written responses to the above are sent to: DEM.MiningRegRehab@sa.gov.au
Endorse Date
*
Endorsed By
Instrument Associations (Instrument)
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.