Your browser is not fully supported. For the best experience, please use the latest version of Chrome, Edge, Firefox, or Safari. You can still access the site, but some features might not function as expected.
Mining Register Search - Instruments
Search Mining Register Instruments and Download Documents
Apply filters to search mining register instruments. Click Apply to get results. Select document for download and click Download File under the table.
Instruments registered in the Mining Register are broken down into three categories:
- Instruments required to be registered under the Mining Act, for example section 15AG(1) of the Mining Act which includes Registerable Dealings such as Agreements.
- Instruments required to be registered under Schedule 1 of the Mining Regulations 2020, for example an instrument providing for the renewal of a mining tenement.
- Discretionary information the Mining Registrar can include on the Mining Register in accordance with section 15AA(3) of the Mining Act, for example, a copy of evidence of public liability insurance.
From this Instrument tab any person can obtain (where available) a copy of an instrument summary report and the supporting document for an instrument.
- An instrument summary report will provide evidence of the registration of a specific instrument.
- An example of an instrument summary report would be a record of an approved program for environment protection and rehabilitation (PEPR) that is registered against a mineral tenement and limited information about the registration of the PEPR, such as the date it was approved and the mineral tenement numbers it was registered over.
- Most instruments will have an instrument summary report available for download.
- An instrument supporting document may also be available and will provide additional detail about the relevant instrument.
- An example of an instrument supporting document available for download is a PEPR.
- Not all instrument records will have an instrument supporting document available for download. For example, a dealing registered under section 15AB of the Act will have an instrument summary report with limited information about the dealing available for download, however an instrument supporting document will not be available for download from the Mining Register.
It should be noted limited information will be available for instruments recorded on the Mining Register prior to January 2021.
Instrument Number | Historical Type | Instrument Category | Instrument Sub-Category | External Note | Summary Document | Supporting Document |
---|---|---|---|---|---|---|
55080 | Statement | Completed Exploration and Expenditure | Total expenditure incurred $94,381.00 | Document Currently Unavailable | ||
51917 | Notice | Entry | Form 21A - Notice of entry on land - prospecting and low impact operations CL6208/404 CL6208/329 | Document Currently Unavailable | ||
51227 | Registerable Dealing | Arrangement | Groundwork Plus Pty Ltd to act as agent on behalf of Adelaide Brighton Cement - relating to establishing a MC, and/or EML, RL and MPL - compliance reporting for ML 6233 MPL 118 PMs 86 120 and RL 109. | Document Currently Unavailable | ||
50296 | Instrument | Renewal | 2 year renewal. | Document Currently Unavailable | ||
52732 | Program for Environment, Protection and Rehabilitation | Approved (Current) | Approval Notification - Exploration Program for Environment Protection and Rehabilitation (EPEPR 2021-035) Review (time extension) EL 6275 & EL 6337. | Document Currently Unavailable | ||
53872 | Direction | Compliance | THIS DIRECTION RELATES TO: Mineral Lease 6137 and 6225 (Mineral Tenements). Property Description: land described in Certificate of Title Volume 5872 Folio 904 and Certificate of Title Volume 5885 Folio 73. REQUIREMENTS: 1. Murray Zircon is directed to: (a) Cease all planned disturbance on ML 6137 or ML 6225 other than carrying out the Directed Works "A" and "B". (b) Undertake a review of the rehabilitation liability estimate as a result of the exceedance of disturbance of land west of Jacka Road, and the exceedances of top soil and overburden disturbance (utilising the calculator available on the Department for Energy and Mining (DEM) website. (c) Provide the Department for Energy and Mining (DEM) with the revised rehabilitation liability estimate calculated in accordance with (b) above by 29 December 2023. (d) Develop a plan to demonstrate your return to compliance to the satisfaction of the Minister or his delegate, which should include a review of PEPR2022/167, and submit a Change in Operations application (refer to guidance material available on the DEM website), by 29 December 2023. (e) Undertake the rootzone soil removal and stockpiling in accordance with the action recommended in the report dated 13 November 2023 by Dr Chris McDonough (Insight Extension for Agriculture) (Directed Works "A"), to be completed as soon as possible, by 29 December 2023. (f) Engage (at Murray Zircon's expense) Dr Chris McDonough (or another independent expert approved by the Director of Minerals Regulation within the Department for Energy and Mining (DEM)) to: (i) monitor, at regular intervals, the undertaking of the Directed Works; and (ii) provide to Murray Zircon a report on the undertaking and outcome of the Directed Works. (g) Provide a copy of the independent expert's report prepared in accordance with (f)(ii) to DEM. (h) The Directed Works must only occur between 6am - 7pm on any day. (i) Engage (at Murray Zircon?s expense) Dr Chris McDonough (or another independent expert approved by the Director Minerals Regulation within DEM) to undertake an audit and provide a report to Murray Zircon of: (i) all stockpiles of topsoil and subsoil; and (ii) all bare and drifting soils across the Mineral Tenements, and, if the audit and report so recommends, ensure hydro mulching is applied as soon as possible, but in any event before 10 January 2024. (j) Provide a copy of independent expert's report prepared in accordance with (i) to DEM together with a written report of the action taken by Murray Zircon in response within seven calendar days of completion of the activities set out in (i). (k) Undertake the construction of tailings cell 6 wall (Directed Works "B"). These works include the rehandling of stockpiled and in situ ore only to facilitate the movement of the Mobile Mining Unit (MMU) and associated pipes and cabling within the pit. Once the MMU has been moved, construction of the cell 6 wall may occur using only stockpiled overburden (situated in the pit area or from current overburden stockpiles). No material may be stockpiled outside of the pit area. (l) Provide written notification and photographs to DEM once the Directed Works B set out in (k) are completed. (m) Ensure all written responses to the above are sent to: DEM.MiningRegRehab@sa.gov.au | Document Currently Unavailable | ||
52555 | Notice | Advanced Exploration | Form 21B - Notice of entry on land - advanced exploration operations. CL6186/442 H833900 B693 Puttapa Station | Document Currently Unavailable | ||
53178 | Instrument | Renewal | 6 year renewal. EL age at new expiry date - 12 years (note: a 50% area reduction will be due at next renewal in accordance with section 30A(7)(b)(ii) of the Act). | Document Currently Unavailable | ||
54585 | Information | Insolvency Event | Insolvency event: Liquidation. | Document Currently Unavailable | ||
54943 | Instrument | Change to Conditions | Pursuant to section 30A(6) of the Mining Act 1971, the conditions of Exploration Licence 6397 are hereby varied as follows: The conditions contained in the Exploration Licence under Schedule B and C are wholly revoked and replaced with the new Schedule of Conditions under Schedule B as attached in this Memorandum. | Document Currently Unavailable |
Can't download Mining Register files: